Pont modulaire

Autres vidéos
August 26, 2024
Catégorie Connexion: Pont modulaire en acier
Récapitulatif: Discover the GW D Modular Steel Bridges, a versatile and durable solution for modern bridge construction. Designed for heavy loading capacity and rapid erection, these bridges offer great stability and long service life. Ideal for both temporary and permanent applications, they are a top choice globally.
Caractéristiques Du Produit Connexes:
  • Heavy loading capacity for diverse bridge applications.
  • Great stability and long fatigue life for reliable performance.
  • Simple structure with rapid erection and easy disassembly.
  • High strength and big stiffness, reducing trabecular high and self-respect.
  • Prefabricated in factory for convenient transport and speedy assembly.
  • Suitable for industrialized manufacture with easy repair and replacement.
  • Lightweight construction with bolted connections for structural stability.
  • Available in single lane (4.2m) and double lane (7.35m) configurations.
FAQ:
  • What are the main advantages of GW D Modular Steel Bridges?
    GW D Modular Steel Bridges offer heavy loading capacity, great stability, long service life, and rapid erection. They are simple in structure and can be used as both temporary and permanent bridges.
  • What types of roadways can the GW D Modular Steel Bridges support?
    The bridges support both steel deck and concrete deck roadways, available in single lane (4.2m) and double lane (7.35m) configurations.
  • How are GW D Modular Steel Bridges constructed and assembled?
    The bridges are prefabricated in factories and assembled on-site using pins and bolts, ensuring quick construction and minimal seasonal impact. They are lightweight and easy to transport.
Vidéos connexes

L'usine Evercross

L'usine Evercross
August 26, 2024

Meule abrasive

Outils abrasifs
November 12, 2024

L'usine Evercross

L'usine Evercross
August 26, 2024

L'usine Evercross 2

L'usine Evercross
August 26, 2024

Pont modulaire 3

Bailey Bridge en acier
August 23, 2024

51.816m HD200 TSR3 PONT BAILEY PRÉASSEMBLÉ

Bailey Bridge en acier
January 12, 2026

Pont modulaire 2

Bailey Bridge en acier
August 23, 2024

Le quai du pont Bailey

Le pont Bailey
August 20, 2024

Livraison du projet Mozambique

L'usine Evercross
January 07, 2026